Building it
Post-frame barn · part 5 of 7 · 1:20
The schedule, the crew packet, the time clock, daily logs, safety, inspections and extras.
What the narrator says
- Part five: out in the field.
- Scheduling drafts the build schedule from the model: every task in order, the inspections as hold points, and the supplier lead times. The site's weather forecast sits right on top.
- Below the chart are the activities and who is on site when, so you can see which crew each week needs.
- Print the crew packet for the truck: the next two weeks, the plan, and the cut list, so nobody is guessing on site.
- On a phone, the crew clocks in and out, and Keystone checks they're actually on the job site. Their hours flow into job cost and payroll.
- The daily log takes a minute: who was there, what got done, deliveries, delays, and photos. It works with no signal and sends when the phone is back in range.
- Toolbox talks, job hazard analyses and incident reports live with the job, and the OSHA log is kept from the incident reports.
- Every inspection is a hold point. A failed footing inspection, with the inspector's note and a photo, stops the work that would cover it until it passes.
- When the owner asks for something extra on site, the crew flags it in the daily log. The office prices it as a change order, and it isn't built until the owner signs.
- Next, the money.